Build Log RV-10 #2

Starting the Horizontal Stabilizer

Had some time this weekend to get started on the horizontal stabilizer.  Spent a little time on Saturday getting the parts prepped for assembly like deburring.  Sunday I got the rear spar match drilled, primed and riveted together.  Also got the entire skeleton match drilled and inserted into the skins.  Made of some new cradles that I attached to the work bench, inserted the skeleton and got all the mating parts match drilled to the skins.  Enough for the day so next step is to take everything apart, debur, prime and then start the final construction of riveting everything together.